
WATER SUPPLY ADVISORY: Emergency Shutdown of Cabatuan Production Plant 3 (CPH 3) to give way to the Repair of Sunken Concrete post and Realignment of Discharge Pipe
What: Emergency Shutdown of Cabatuan Production Plant 3 (CPH 3) to give way to the repair of sunken concrete post and realignment of discharge pipe
When: May 4, 2018, 2-4PM
Affected Areas:Poblacion, Alaminos City including Central Business District
Affected areas may experience low pressure to no water on the said period.
Thank you for bearing with us.
ACWD Management