Skip to main content

WATER SUPPLY ADVISORY: SCHEDULED WATER INTERRUPTION – SHUTDOWN OF QUIBUAR I PRODUCTION PLANT

What:
SCHEDULED WATER INTERRUPTION
– SHUTDOWN OF QUIBUAR I PRODUCTION PLANT

When:
DECEMBER 5, 2020 (SATURDAY) – 9:00 PM to 2:00 AM
Purpose: WELL DISINFECTION

Affected Areas: LOW PRESSURE TO NO WATER
• ALOS
• AMANGBANGAN
• BALAYANG
• BOLANEY
• DULACAC
• MAAWI
• PARTS OF BISOCOL
• PARTS OF QUIBUAR
• STA. MARIA
• TANGCARANG
• LUNA, MABINI

Please save enough water for your consumption during this period.

Thank you for bearing with us.

Stay informed

Don't hesitate to contact us.

Official Website of Alaminos City Water District