WATER SUPPLY ADVISORY – SHUTDOWN OF QUIBUAR II PRODUCTION PLANT October 3, 2019, 9:00 PM ON WARDS
WHAT : SCHEDULED WATER INTERRUPTION – SHUTDOWN OF QUIBUAR II PRODUCTION PLANT
WHEN : October 3, 2019, 9:00PM ONWARDS
PURPOSE: INTERCONNECTION OF NEWLY INSTALLED 6” TRANSMISSION LINE ALONG SITIO TICOB, ALOS, ALAMINOS CITY, TO THE EXISTING 6” TRANSMISSION LINE IN TAGUDIN, MABINI, PANGASINAN
Affected Areas (NO WATER):
1. MABINI (Tagudin, Poblacion, Calzada)
PLEASE SAVE ENOUGH WATER FOR YOUR CONSUMPTION DURING THIS PERIOD.
THANK YOU FOR BEARING WITH US.
#ACWD, your #trusted Water District in Western Pangasinan. #Working to serve you #better. #ACWD ay #TAPAT.